12 month warranty Request a Quote Technical Support
Sign In

easYgen-3500XT P1/P2/LT: Redundant Ethernet, LogicsManager, 690 V Metering

Nov 20, 2026
KY Automation
Selection Guide
Contents [hide]

    The easYgen-3500XT is the top package in the Woodward 3000XT paralleling genset controller series. It is not a step above the 3200XT because of a higher genset count. The 3200XT already supports up to 32 gensets; the 3500XT adds 16 LS-5 breaker controllers, redundant Ethernet, direct 690 VAC connection, and 4000 m operation without derating, while the P2 tier adds the three-phase busbar voltage measurement and phase rotation monitoring needed for CHP. Above 32 gensets, the GC-3400XT group-controller tier takes over.

    P1 vs P2: paralleling and CHP roles

    The P1 tier (8440-2085/8440-2086 class) carries the 3500XT platform: up to 32 gensets across 32 bus segments, 16 LS-5 breaker controllers on the dedicated CANopen network, redundant load sharing over Ethernet B/C, and the LogicsManager programmable logic engine for AMF, peak-shaving and CHP interlocks built in-controller. The P2 tier is the CHP/Co-Gen model: expanded onboard I/O, three-phase busbar voltage measurement, phase rotation monitoring between generator-busbar and busbar-utility, and an interface expansion slot. P1 coordinates paralleling and LS-5 breakers; P2 brings CHP metering and I/O into the controller.

    The LT variant: -40°C outdoors, not 690 V

    Direct 690 VAC connection is common to the 3500XT platform: generator, mains and busbar circuits connect without PT stepping; the P2 tier adds three-phase busbar voltage measurement, and the LT variants do not change that measurement chain. The LT variants add the -40°C outdoor operating range for winterized CHP skids, arctic sites and unheated containerized plants. An indoor plant does not pay for the LT premium; 690 V switchgear alone does not require LT.

    The decision rule

    P1 and P2 divide by application, not by breaker count: P1 for LS-5 breaker coordination, redundant Ethernet and paralleling within 32 gensets; P2 for CHP three-phase busbar voltage, phase rotation monitoring, expanded I/O and the interface slot. LT is an environment choice: -40°C outdoors, not a voltage choice. A cold-region 690 V CHP plant points to P2-LT; a 400 V datacenter with 32 gensets that only parallels generator breakers and leaves bus and mains breakers to a third-party PLC or external synchronizer can stay on the 3200XT. All tiers share the same controller platform and expansion does not require relearning the configuration.

    What LogicsManager replaces

    LogicsManager is the programmable logic engine inside the controller. It replaces the small interlock PLC that used to sit beside the paralleling controller, handling AMF, peak-shaving and CHP interlocks. Plant-wide SCADA logic stays upstream; LogicsManager is the interlock layer, not the plant-wide control core.

    Where redundant Ethernet matters

    Small single-network plants can run on a single network without issue. Redundancy pays where the plant cannot tolerate a controller-network event—datacenters and continuous CHP sites—and the 3500XT Ethernet B/C dual-network design is aimed at those cases. For a standby plant within 32 gensets that can accept a single-network outage, dual Ethernet is not mandatory.

    Contents