

Product Specifications
- Manufacturer
- Flowline
- Model Number
- UG01 / UG03
- Type
- Reflective Ultrasonic Level Transmitter
- Range
- UG01: 1.5in-4.9ft; UG03: 4in-9.8ft
- Output
- 4-20mA, 4 relays
- Dead Band
- 1.5in (UG01) / 4in (UG03)
- Beam Width
- 2in
- Documents
- Product Manual, Product Specs (2 Files)
Product Description
The Flowline EchoPod UG01 and UG03 reflective ultrasonic level transmitters offer continuous level measurement up to 9.8 feet (3m) and feature a 4-20 mA analog signal output and four relays. Additionally, configuration of the UG01 and UG03 can be done via WebCal software (free download). What makes this Flowline EchoPod ultrasonic level transmitter stand out is its proprietary Reflective Technology™ which allows for reliable measurement in condensing environments.
Each relay of the Flowline EchoPod UG01 and UG03 reflective ultrasonic level transmitters can be configured for alarm, automatic fill or empty functions. Common applications for these EchoPod units include day tank, IBC or drum, cooling tower, ski or machine, process tank and waste sumps. Additionally, the UG01 and UG03's Reflective Technology™ make it an ideal fit for small tanks with non-foaming or highly vaporous media such as chemicals, water, wastewater and oil.
WebCal software is a PC utility program that enables users to easily configure and test compatible Flowline level sensors to their measurement and control requirements.
Related Products
Resources & Documentation
Reflective Ultrasonic Level Transmitter - 4 Relays | Flowline EchoPod UG01 UG03
Product Specifications
- Manufacturer
- Flowline
- Model Number
- UG01 / UG03
- Type
- Reflective Ultrasonic Level Transmitter
- Range
- UG01: 1.5in-4.9ft; UG03: 4in-9.8ft
- Output
- 4-20mA, 4 relays
- Dead Band
- 1.5in (UG01) / 4in (UG03)
- Beam Width
- 2in
- Documents
- Product Manual, Product Specs (2 Files)















